Drawings
Confirm layout drawings, panel numbers, gate direction, corner posts and special openings before production.
Gabion MeshManufacturer & Exporter
Get Quote
Construction advice page
A better independent site should answer what happens after the buyer receives the goods. This guide covers basic installation planning for fence panels, robot safety fence, sports fence, gabion baskets, steel grating and H beam handling.
Installation guide
Final installation should follow local codes, project drawings and engineering requirements. These notes help buyers prepare clearer inquiries and reduce missing accessories.
| Product Type | Before Installation | Important Accessories | Installation Notes |
|---|---|---|---|
| Prison and perimeter fence | Confirm fence line, post spacing, gate location and top security requirement. | Posts, clamps, anti-tamper bolts, Y arms, razor wire, gates. | Install posts vertically, keep panels aligned, then add top arms and razor wire with safety handling. |
| Sports court fence | Confirm court size, fence height, gate direction and high ball-stop areas. | Round posts, top rails, tension bars, tie wire, clamps, caps, gates. | Install posts and rails first, tension the chain link mesh evenly and finish with gates and fittings. |
| Robot safety fence | Confirm robot cell layout, access doors and safety switch bracket positions. | Base plates, anchor bolts, hinges, handles, locks, switch brackets. | Install posts by numbered layout, connect panels, align doors and confirm access points. |
| Gabion baskets | Prepare level foundation, stone size and drainage conditions. | Spirals, lacing wire, stiffeners, clips, diaphragms. | Assemble baskets, connect units, add stiffeners, fill stones evenly and close lids securely. |
| Steel grating | Confirm bearing direction, support spacing, panel layout and opening cutouts. | Grating clips, saddle clips, bolts, banding bars. | Lay panels in correct bearing direction and fix with clips according to project requirements. |
| H beam steel | Confirm structural drawing, size, grade, lifting plan and storage area. | Bundles, marks, lifting belts, spacers, protective packing. | Handle according to site safety rules and project engineering requirements. |
Site checklist
Many installation problems come from missing accessories, unclear labels or uncertain gate direction. These checks help avoid delays.
Confirm layout drawings, panel numbers, gate direction, corner posts and special openings before production.
Check bolts, clamps, caps, tie wire, clips, hinges, locks and other small parts before shipment.
Use labels on panels, posts, cartons and pallets when the project has many sizes or installation zones.
Confirm ground type, concrete base, drainage, slope, wind exposure and local installation rules.
FAQ
We can support basic layout and accessory matching according to the buyer's drawings. Final construction drawings should be approved by the project engineer or contractor.
Yes. For larger orders, cartons and bundles can be marked by area, item or panel number to help installers identify parts.
Yes. Grating clips and fixing accessories can be supplied when required. Buyers should confirm support type and panel layout.
Installation support
Send project drawings, product type, quantity and destination port. We can suggest accessories, labels and export packing.